Beginning Monday, June 3, access to most of Hazel Ave. in Kimball will be restricted to local traffic. The above signs are at Hazel Ave. and Main St. (Hwy. 15). Major construction soon will begin on Hazel Ave. to replace sewer and water lines and then to repave the street. It is anticipated (and greatly hoped) that the project will be completed before school starts in the fall, and possibly in time for Kimball Days in August.